Home         |      Company Profile        |         News         |        Products         |          Honor          |        Download         |        Contact Us

Products
 

 
Location:Home >> Company News
How to deal with the the anchor drilling process water seepage problem

UpdateTime:[2012/10/6 8:57:45]    Hits:[2339]   From:TONRY MINING SAFETY SUPPORT TECHNOLOGY CO.,LTD

The Shandong TongRui Mining Technology Co., Ltd. about the anchor cable drilling process water seepage treatment for everyone:

During drilling, or after drilling when the blow hole, is blown out from the hole are some stone grains and gray or yellow pellet without dust hole seepage, rock dust is attached to the hole wall, this when the hole depth has enough water into high-pressure wind net, until blowing water;

If the hole is deep enough, although the impact is work, there is still footage, it must immediately stop drilling, pull out the drill, and then continue to wash the hole drilling, and so on, until the end.

Sometimes seepage hole large, stagnant water, blown out of the mud and gravel, paste this case the rock powder does not live in the hole wall, as long as the impactor, you can continue to drill.

If the seepage is too big, as well as submerged the anchor cable impactor, the impactor will automatically stop working, should pull out the drill pressure grouting.

Print】 【Top】【Close】  
previous: Up shell-the prest...      Next: The prestressed an...
 
  Address:Manzhuang Steel Market, Taian, Shandong, China
TELevision:(+86538)6362226 6366579 6366578
M.T.:13335294999
FAX:0538-6366579
P.C.:271024
http://www.kuangshanzhihu.com    http://www.sdtr88.cn
Copyright: TONRY MINING SAFETY SUPPORT TECHNOLOGY CO.,LTD    Address:Manzhuang Steel Market, Taian, Shandong, China  Technical Support :飞讯网络 Lu ICP 10009020 No.

Home | Add to Favorites | Admin